Work Procedure





        (3) land leveling pattern
         •  The land leveling work may be
           performed after crushing soil or   ⊙ Turning:                 Moving direction            Reverse driving
           not.
         •  The vehicle speed can be set                                       (14)
           faster when performing the land                                     (10)                                 4 34 4 34
           leveling work with soil crushed                                     (4)
           already.                            Finish                          (5)
         •  When working in a wet field, fill                                  (3)             (9) (13)
           the field with a sufficient amount                                  (6)
           of  water  so  that  the  trace  of            (15) (11)            ()
           plowing cannot be seen.                                             (7)
         •  The border shown in the fig-                                       (1)    Start
           ure should be set a little narrow-                          (8)
           er than two times of one plowing                                                             A: Border
           width.                                                     (1)
         •  Refer to the alternating returning                                                    A
           pattern for other details.