Page 97 - tymp
P. 97
Work Procedure
(3) land leveling pattern
• The land leveling work may be
performed after crushing soil or ⊙ Turning: Moving direction Reverse driving
not.
• The vehicle speed can be set (14)
faster when performing the land (10) 4 34 4 34
leveling work with soil crushed (4)
already. Finish (5)
• When working in a wet field, fill (3) (9) (13)
the field with a sufficient amount (6)
of water so that the trace of (15) (11) ()
plowing cannot be seen. (7)
• The border shown in the fig- (1) Start
ure should be set a little narrow- (8)
er than two times of one plowing A: Border
width. (1)
• Refer to the alternating returning A
pattern for other details.
995E003A
4 - 5